Kerala Building Permit Fee Calculator

LSGD 2026 Rates (Effective August 1, 2024)

⚠️ Liability Disclaimer: For Estimation Only (Click to Read)

This tool provides estimates based on general algorithms. It does NOT constitute professional engineering advice. Structures must be verified by a licensed engineer per IS Codes. By using this tool, you agree to indemnify K-First against any financial losses.

Sq.MSq.Ft
sq.m

Calculation Complete.

LSGD Building Permit Fee Rates (August 2024)

Effective: August 1, 2024 | Source: Kerala Local Self Government Department

Local Body Type Rate Note
Panchayat Residential Free / ₹25 / ₹50 / ₹75/ Slab-based 0-80sqm: Free | 81-150sqm: ₹25 | 151-300sqm: ₹50 | >300sqm: ₹75
Panchayat Commercial Free / ₹35 / ₹75 / ₹100/ Slab-based 0-80sqm: Free | 81-150sqm: ₹35 | 151-300sqm: ₹75 | >300sqm: ₹100
Panchayat Industrial Free / ₹25 / ₹50 / ₹75/ Slab-based 0-80sqm: Free | 81-150sqm: ₹25 | 151-300sqm: ₹50 | >300sqm: ₹75
Municipality Residential Free / ₹35 / ₹60 / ₹100/ Slab-based 0-80sqm: Free | 81-150sqm: ₹35 | 151-300sqm: ₹60 | >300sqm: ₹100
Municipality Commercial Free / ₹45 / ₹75 / ₹125/ Slab-based 0-80sqm: Free | 81-150sqm: ₹45 | 151-300sqm: ₹75 | >300sqm: ₹125
Municipality Industrial Free / ₹35 / ₹60 / ₹100/ Slab-based 0-80sqm: Free | 81-150sqm: ₹35 | 151-300sqm: ₹60 | >300sqm: ₹100
Corporation Residential Free / ₹40 / ₹70 / ₹100/ Slab-based 0-80sqm: Free | 81-150sqm: ₹40 | 151-300sqm: ₹70 | >300sqm: ₹100
Corporation Commercial Free / ₹50 / ₹85 / ₹150/ Slab-based 0-80sqm: Free | 81-150sqm: ₹50 | 151-300sqm: ₹85 | >300sqm: ₹150
Corporation Industrial Free / ₹60 / ₹75 / ₹100/ Slab-based 0-80sqm: Free | 81-150sqm: ₹60 | 151-300sqm: ₹75 | >300sqm: ₹100

Permit Fee Calculation Formulas

1

Standard Permit Fee (LSGD 2024 Bracket Method)

Total Area (sq.m) × Slab Rate

The 'Cliff Edge' System: 1) If Total Area ≤ 80 sq.m, Permit Fee is ₹0 (Free). 2) If Total Area > 80, the ENTIRE area is charged at the applicable slab rate (e.g. ₹25/sq.m). The exemption is a threshold, not a deduction.

Where: Exemption = ≤ 80 sq.m = ₹0, Chargeable = > 80 sq.m = Full Area × Rate
2

Regularization Fee (Municipality/Corporation)

Standard Fee × 3

Penalty for unauthorized construction. 3x the normal permit fee for completed structures.

Where: Standard Fee = Normal permit fee amount
3

Extension Fee (Before Expiry)

Current Permit Fee × 10%

Applied when requesting extension before the 5-year permit validity expires.

Where: Current Permit Fee = Fee calculated at current rates (not original permit rates)
4

Renewal Fee (After Expiry)

Current Permit Fee × 50%

Applied when permit has already expired. Significantly higher than extension fee.

Where: Current Permit Fee = Fee calculated at current rates

Worked Examples

Calculate Permit Fee for 1500 sq.ft House in Panchayat

New residential construction in a Panchayat area

1

Convert area to sq.m

1500 sq.ft ÷ 10.764 = 139.4 sq.m
2

Check Exemption (Cliff Edge)

139.4 > 80 sq.m, so NOT Exempt. Full area is chargeable.
3

Find Rate Slab

139.4 falls in '81-150 sq.m' Slab. Rate = ₹25/sq.m.
4

Calculate Permit Fee

139.4 sq.m × ₹25 = ₹3,485
5

Add Application Fee

139.4 is in 101-300 slab: ₹3,485 + ₹1,000 = ₹4,485

Result: ₹4,485

Calculate Fee for 800 sq.ft Shop in Municipality

Small commercial building in Municipality

1

Convert area to sq.m

800 sq.ft ÷ 10.764 = 74.3 sq.m
2

Check Exemption Limit

74.3 sq.m ≤ 80 sq.m. Base Permit Fee is ₹0.
3

Calculate Total

Permit Fee (₹0) + Application Fee (₹300) = ₹300

Result: ₹300

⚠️

The < 80 sq.m exemption applies to the PERMIT FEE only. You still need to apply for a permit and pay application fees.

📍

Panchayat regularization fees include Land Fair Value calculations. Online estimators may be inaccurate—consult your local Panchayat office.

📅

Rates shown are from LSGD August 2024 notification. Check for updates as rates may change annually.

Permit Extension vs. Renewal

Building permits in Kerala are valid for 5 years.

  • Extension: If applied before expiry, fee is 10% of current permit fee.
  • Renewal: If applied after expiry, fee jumps to 50% of current permit fee.

Note: Fees are calculated based on rates active at the time of payment, not your original permit date.